In March 2021 a new site in North Dakota was in need of a vent line installation and turned to Victaulic to help with a quick 2-day field installation. This project partnership began with Victaulic VDC developing bills of material to ensure the product was properly procured and delivered to the site according to the owner’s build strategy.

This project was a full field installation, meaning all pipe was grooved and installed onsite. To support this build strategy, Victaulic field engineers were onsite at the time of delivery, training the crew on proper grooving and installation methods, and remaining onsite throughout the 2-day installation.

The project partnership Victaulic provided from preconstruction through onsite training and installation helped the owner to complete this vent line installation on time and on budget. The success of this project showcased Victaulic’s value-engineered solutions and maximized onsite productivity.

The owner has selected Victaulic system solutions for 4 additional projects throughout 2021.

TYPE DE PROJET :
Production Facility
Wastewater Icon
Maître d'ouvrage :

Ingénieur :

Matériau de tube :

Acier au carbone

Localisation :

North Dakota

Installateur :

Diamètre des tubes :

4’’ - 8’’

Solutions :

  • Project Modeling and Design
  • Diminution de la durée des chantiers
  • Facilité d'installation
  • Onsite Training & Support

In March 2021 a new site in North Dakota was in need of a vent line installation and turned to Victaulic to help with a quick 2-day field installation. This project partnership began with Victaulic VDC developing bills of material to ensure the product was properly procured and delivered to the site according to the owner’s build strategy.

This project was a full field installation, meaning all pipe was grooved and installed onsite. To support this build strategy, Victaulic field engineers were onsite at the time of delivery, training the crew on proper grooving and installation methods, and remaining onsite throughout the 2-day installation.

The project partnership Victaulic provided from preconstruction through onsite training and installation helped the owner to complete this vent line installation on time and on budget. The success of this project showcased Victaulic’s value-engineered solutions and maximized onsite productivity.

The owner has selected Victaulic system solutions for 4 additional projects throughout 2021.