Gold One – Plant Optimization Project

Mine water transport line joined by Victaulic AGS couplings, which accommodate system deflection
Wastewater Icon

LE PROJET EN BREF

TYPE DE PROJET :
Conduite de transport
Maître d'ouvrage :

Gold1

Ingénieur :

Gold1

Installateur :

Mocke Pipeline Construction

Matériau de tube :

Acier au carbone

Diamètre des tubes :

16 – 18"

Localisation :

Randfontein, Afrique du Sud

Solutions :

  • Facilité d'installation
  • Vitesse d'installation
  • Flexibilité
  • Advanced Grooved System (AGS)
  • Safety

When looking for a solution to join an 8km long 400-450mm (16’’ – 18″) pipeline used to transport water from a dam to the Fraser Alexander mine dumps, Gold 1 International Limited relied on Victaulic solutions.

To begin reclaiming the mine dump, Fraser Alexander needed to get the 8km pipeline installed. For this reason, Gold 1 wanted the pipeline installed quickly, with enhanced system reliability. They chose to partner with Victaulic on this critical application.

Victaulic provided system solutions for the pipeline including Style W77 AGS Flexible and Style W07 AGS Rigid Couplings. The contractor, Mocke Pipeline Constructions, was able to install 25 to 30 pipe spools a day, enhancing productivity on-site when compared to previously employed flanged joining methods. Victaulic Style W77 flexible couplings were installed to adhere to the challenging terrain, with custom-designed cups that encase the coupling’s bolts and nuts to prevent theft.

The use of Victaulic AGS solutions enabled Gold 1 to enhance onsite productivity and mitigate risk, completing the project on time and on budget.

TYPE DE PROJET :
Conduite de transport
Wastewater Icon
Maître d'ouvrage :

Gold1

Ingénieur :

Gold1

Matériau de tube :

Acier au carbone

Localisation :

Randfontein, Afrique du Sud

Installateur :

Mocke Pipeline Construction

Diamètre des tubes :

16 – 18"

Solutions :

  • Facilité d'installation
  • Vitesse d'installation
  • Flexibilité
  • Advanced Grooved System (AGS)
  • Safety

When looking for a solution to join an 8km long 400-450mm (16’’ – 18″) pipeline used to transport water from a dam to the Fraser Alexander mine dumps, Gold 1 International Limited relied on Victaulic solutions.

To begin reclaiming the mine dump, Fraser Alexander needed to get the 8km pipeline installed. For this reason, Gold 1 wanted the pipeline installed quickly, with enhanced system reliability. They chose to partner with Victaulic on this critical application.

Victaulic provided system solutions for the pipeline including Style W77 AGS Flexible and Style W07 AGS Rigid Couplings. The contractor, Mocke Pipeline Constructions, was able to install 25 to 30 pipe spools a day, enhancing productivity on-site when compared to previously employed flanged joining methods. Victaulic Style W77 flexible couplings were installed to adhere to the challenging terrain, with custom-designed cups that encase the coupling’s bolts and nuts to prevent theft.

The use of Victaulic AGS solutions enabled Gold 1 to enhance onsite productivity and mitigate risk, completing the project on time and on budget.