Fabrication Solutions Installed at Permian Basin Production Facility

Permian Basin Production Facility
Wastewater Icon

LE PROJET EN BREF

TYPE DE PROJET :
Production Facility
Maître d'ouvrage :

Ingénieur :

Installateur :

Matériau de tube :

Acier au carbone

Diamètre des tubes :

2’’ - 8’’

Localisation :

Permian Basin

Solutions :

  • Fabrication
  • Project Modeling and Design
  • Diminution de la durée des chantiers
  • Facilité d'installation
  • Onsite Training & Support

An owner in the Permian Basin recently completed construction on a new production facility and chose to partner with Victaulic for vertically integrated fabrication solutions. Victaulic’s in-house modeling team worked closely with the owner to design the piping systems within the containment area, on the site separators, and on the oil, water, and vent lines.

The 2’’ – 8’’ system was fabricated at Victaulic’s fabrication shop and delivered in 3 sequential shipments to meet the project’s unique build strategy. Victaulic field engineers were onsite at the time of delivery to provide training and support to the installation contractor and crew. All systems were installed seamlessly, with 95% of the project installed in just over 2 weeks.

Partnering with Victaulic mitigated risk and maximized onsite productivity. The use of Victaulic vertically integrated fabrication solutions enabled the production facility to be brought online on time and on budget.

TYPE DE PROJET :
Production Facility
Wastewater Icon
Maître d'ouvrage :

Ingénieur :

Matériau de tube :

Acier au carbone

Localisation :

Permian Basin

Installateur :

Diamètre des tubes :

2’’ - 8’’

Solutions :

  • Fabrication
  • Project Modeling and Design
  • Diminution de la durée des chantiers
  • Facilité d'installation
  • Onsite Training & Support

An owner in the Permian Basin recently completed construction on a new production facility and chose to partner with Victaulic for vertically integrated fabrication solutions. Victaulic’s in-house modeling team worked closely with the owner to design the piping systems within the containment area, on the site separators, and on the oil, water, and vent lines.

The 2’’ – 8’’ system was fabricated at Victaulic’s fabrication shop and delivered in 3 sequential shipments to meet the project’s unique build strategy. Victaulic field engineers were onsite at the time of delivery to provide training and support to the installation contractor and crew. All systems were installed seamlessly, with 95% of the project installed in just over 2 weeks.

Partnering with Victaulic mitigated risk and maximized onsite productivity. The use of Victaulic vertically integrated fabrication solutions enabled the production facility to be brought online on time and on budget.